Read the ambiguous expense rows before the totals, follow a correct-number/wrong-citation repair, and keep a weekly plan distinct from an unconfirmed proposal. The original inputs and recorded outputs remain available.
Concrete examples show how to handle instructions embedded in a file, identifying details in feedback, and a source check that failed. Each explains what to do next and where the authorization ends.
Open complete examples directly from kit pages. Meeting and weekly-update examples now distinguish current authority from retained history.
Corrections & revision history
/ repair
Keep the current plan, and keep preparation separate from review
The authored weekly update retains the planned 14 October review while a move to 16 October is unconfirmed. Morgan prepares the weekly draft for manager review; the source does not assign Morgan as reviewer. Current instructions distinguish proposals, authorized changes and unresolved contradictions. Historical model output is unchanged.
Asset
cw:kit:weekly-manager-update
Affected revisions
2.0.0 and interim 2.1.0 private candidates; no verified public release
A withdrawn decision is history, not continuing permission
The current task starts with a concise summary and treats an explicit authorized withdrawal differently from an unresolved conflict. A separate interpretation also removes an unsupported second estimate-delivery obligation from the teaching. Original model logs remain available unchanged; the revised instruction is not represented as rerun.
Asset
cw:kit:meeting-decisions
Affected revisions
2.0.0 private candidate; no verified public release
Each shortened draft now carries its own attribution
All three authored drafts now name the fictional report and publication date. The newsletter also retains the mid-size-firm population. Each draft is checked independently against its length and evidence requirements; a claim-map row is not proof that the words survived shortening.
Asset
cw:kit:source-to-content
Affected revisions
2.0.0 private candidate; no verified public release
Discovery can proceed before a later build decision
The brief distinguishes already-authorized discovery from export-dependent field work and later build approval. The source establishes no approved build budget, not the absence of every possible discovery budget. A small project may use one concise document rather than three mandatory files.
Asset
cw:kit:project-brief
Affected revisions
2.0.0 and interim 2.1.0 private candidates; no verified public release
Cleanup check now verifies amounts and currency totals
Checker 3.0.0 rejects a wrong normalized amount and reversed USD/EUR totals that previously passed. It also checks known field values and which rows were counted. The four original output files are unchanged; rechecking them passes all 12 current checks. Earlier 11-check results remain dated records, not new agent runs.
Asset
cw:kit:spreadsheet-cleanup
Affected revisions
Checker 2.0.0 in kit 2.0.0 (private candidate; no verified public release)
Before public release, checker revision 2.0.0 fixed a false pass in design version 1 of the spreadsheet-cleanup "No currency guessed" rule: a blank original currency filled in now fails even without a normalized-currency column; the four original recorded runs keep their files and still pass all eleven checks, while the bad synthetic control moves from 3 passes/8 failures to 2 passes/9 failures; use /check/spreadsheet-cleanup/.
Asset
cw:kit:spreadsheet-cleanup
Affected revisions
V4 design checker definition 1 (not a verified public release)
Before public release, the synthetic brief now asks the successor to create the missing draft before checking source coverage. It no longer asks for an inspection of a file that does not exist.
Asset
cw:kit:agent-handoff
Affected revisions
2.0.0 (private candidate; no verified public release)
Before public release, the instruction now permits edit references or brief summaries in the inconsistency table and keeps full replacement passages in proposed_edits.md. The impact scale now reads high/medium/low.
Asset
cw:kit:document-consistency
Affected revisions
2.0.0 (private candidate; no verified public release)
Before public release, the package distinguishes sources checked on 13 October from the recorded comparison on 15 October. Original run evidence is unchanged.
Asset
cw:kit:source-change-watch
Affected revisions
2.0.0 (private candidate; no verified public release)
Before public release, the research memo sample now includes dated notes from two official sources for an offline comparison. The notes distinguish documented features from unverified account access and preserve the unchanged instruction.
Asset
cw:kit:research-to-decision-memo
Affected revisions
2.0.0 (private candidate; no verified public release)